Status as of 30 September 2026

Construction progress

Schedule
Phase A62 714 m²
Start: Q2 2026Completion: end of Q2 2027
  1. Site
    In progress

    Current works status — 30 September 2026

    Frame erection is under way: cranes are setting columns along the grid, and some of the columns are already concreted. Utilities are being laid in parallel, and an access road is being built along the plot.

  2. Site

    Status as of 25 September 2026

    Column installation is under way: concreting in formwork, columns in place and rebar cages. The site entrance and site compound are in place.

  3. Site

    Status as of 15 September 2026

    Foundation works continue: the pocket grid is complete, column rebar cages are being installed and ground-beam cages are assembled. A footpath is being laid along the access road.

  4. Site

    Status as of 18 August 2026

    Earthworks, utilities installation and foundation pockets were under way on site.

  5. Q2 2026
    Construction start
    In progress

    Phase A — 62 714 m²

    First phase of the warehouse complex. Completion — end of Q2 2027. Deal formats: lease and built-to-suit.